      自動(dòng)上料攪拌機被阻塞時(shí)的處理步驟

      來(lái)源:http://www.bestinko.com/日期:2022-11-30

      概述:由于設備本身的特性,自動(dòng)上料攪拌機廣泛用于各種建筑物。長(cháng)期使用該設備不可避免地會(huì )引起各種故障問(wèn)題。它們中的大多數已被阻塞,但是如果
      由于設備本身的特性,自動(dòng)上料攪拌機廣泛用于各種建筑物。長(cháng)期使用該設備不可避免地會(huì )引起各種故障問(wèn)題。它們中的大多數已被阻塞,但是如果設備中出現此類(lèi)問(wèn)題,我們該怎么辦?
      Due to the characteristics of the equipment, automatic feeding mixers are widely used in various buildings. Long term use of the equipment will inevitably cause various failures. Most of them have been blocked, but what should we do if such problems occur in the device?
      每次充電前,用水沖洗進(jìn)水口,以在進(jìn)水過(guò)程中保持進(jìn)水口濕潤。
      Before each charging, flush the water inlet with water to keep the water inlet wet during the water inlet process.
      在裝載過(guò)程中,將裝在車(chē)輛上的清洗水箱注滿(mǎn)水。充電后,沖洗入口并清潔入口附近的混凝土。
      During loading, fill the washing water tank installed on the vehicle with water. After charging, flush the inlet and clean the concrete near the inlet.
      在施工現場(chǎng)卸貨后,沖洗卸貨箱,然后向混凝土儲箱中添加30-40L的洗滌水。車(chē)輛回程期間,保持混凝土儲罐緩慢旋轉。
      After unloading at the construction site, wash the unloading box, and then add 30-40L of washing water to the concrete storage box. Keep the concrete tank rotating slowly during vehicle return.
      下次裝載之前,請記住將混凝土儲罐中的污水排干。
      Before the next loading, please remember to drain the sewage from the concrete tank.
      自動(dòng)上料攪拌機
      每天及時(shí)處理清潔混凝土儲罐和機器周?chē)倪M(jìn)口和出口。自動(dòng)上料攪拌機的清潔點(diǎn)可防止水泥和混凝土結塊。
      Clean the inlets and outlets around the concrete tanks and machines in a timely manner every day. The cleaning point of automatic feeding mixer can prevent cement and concrete from caking.
      另外,自動(dòng)上料攪拌機在進(jìn)行輸送時(shí)如果有出現停工,大多是因為管道的堵塞引發(fā)的,但也存在非堵塞性的暫停工作,那么我們該怎么辦?這時(shí)應該采取減慢輸送的方式。利用罐內的殘料進(jìn)行慢速輸送;在輸送的過(guò)程中,要先找到中斷的部位,停止輸送;如果是夏天,中斷時(shí)間不超過(guò)一小時(shí)。在使用自動(dòng)上料攪拌機的過(guò)程中要注意時(shí)刻保持注意力集中,以免因為操作失誤造成的機器損壞以及工期延誤。
      In addition, if the automatic feeding mixer shuts down during transportation, most of it is caused by the blockage of the pipeline, but there is also a non blocking suspension, what should we do? At this time, slow down the conveying. Use the residues in the tank for slow transportation; In the process of conveying, it is necessary to find the interrupted part and stop the conveying; If it is summer, the interruption time shall not exceed one hour. In the process of using the automatic feeding mixer, attention should be kept at all times to avoid machine damage and construction period delay caused by operational errors.
      以上知識是關(guān)于自動(dòng)上料攪拌機被阻塞時(shí)的處理步驟。在這里,小編需要提醒大家,他們需要做好設備維護和保養工作,以免設備使用失敗。關(guān)注我們http://www.bestinko.com,帶您認識更多有關(guān)攪拌機的事項!
      The above knowledge is about the handling steps when the automatic feeding mixer is blocked. Here, we need to remind everyone that they need to do a good job in equipment maintenance and repair to avoid equipment failure. Follow us http://www.bestinko.com , let you know more about the mixer!

      截屏,微信識別二維碼

      RM新时代注册
      <optgroup id="rs0uz"><var id="rs0uz"></var></optgroup>
      <menu id="rs0uz"></menu>

      1. <optgroup id="rs0uz"><var id="rs0uz"></var></optgroup>

      2. <menuitem id="rs0uz"></menuitem>
      3. RM新时代官网 RM新时代官网 RM新时代登录网址 RM新时代 RM新时代是什么平台
        <optgroup id="rs0uz"><var id="rs0uz"></var></optgroup>
        <menu id="rs0uz"></menu>

        1. <optgroup id="rs0uz"><var id="rs0uz"></var></optgroup>

        2. <menuitem id="rs0uz"></menuitem>
        3. RM新时代投资官网 RM新时代反波胆app rm新世界反波胆下载 RM新时代首页 RM新时代资金盘 RM新时代反波胆靠谱吗 新时代反波胆 RM新时代首页 rm新时代足球交易平台 RM新时代反波胆最新消息